久久婷婷五月综合97色-黑人上司粗大拔不出来电影-在线天堂资源www在线中文-免费人成网站在线观看99

Welcome to the official website of jiangsu libang electromechanical equipment co., LTD.

  • WeChat public number

  • Mobile web site
  • 中文

service hotline:

400-025-9918

NEWS

Industry dynamic

Location:Home > news > Industry dynamic - Problems with evaporator equipment are solved

Problems with evaporator equipment are solved
Release time:2018-6-8 11:22:04      Number of clicks:1770
1. The evaporator often fails to defrost
Evaporator electrical heating tube is very easy to burn out, and as the evaporator with heating tube series electric heating tube is made up of 2 a group, one of the burning, lines can not work normally, so the frost on the evaporator ontology can't melt.
2. The collecting pan freezes
Water dish inside is not set electric heating tube, although has the same electric heating wire and the water pipe, but power is very small, poor quality, often fails, due to the low temperature temperature reached - 18 ℃ below, after the evaporator defrosting, water entering the water pan is too late to discharge will regelation, cannot normal run off through the drain pipe.
3. The downpipe is blocked with ice
The electrical heating wire of the downpipe is out of order. Because the electric heating wire of the downpipe is always in working state, and its own quality is poor, the failure rate of the electric heating wire of the downpipe is very high. As the original downpipe was long, once its electric heating wire failed, in the low temperature environment, the water entering the downpipe began to freeze again before it could flow away, and the defrosting could not be realized normally all the time.
Improvement measures:
1. The main reason why the evaporator cannot melt frost is that the quality of electric heating is saved in the problem, and the series method is used. Therefore, we should use the heating tube with rated voltage of 220v and use parallel connection.
2. Re-customize the water collecting plate to ensure that the water from the evaporator defrosting will not freeze twice after it reaches the water collecting plate.
3. The improved cut-off of the downpipe is to shorten the downpipe as much as possible, add another collecting bucket under the collecting pan, and replace the new collecting bucket before the water in the collecting bucket is full.

The last one:Cold storage structure and main equipment
Next:Key points of oil replacement in screw refrigeration compressor

Return list

Recommended for you

  • Mobile web site

  • The official WeChat

版權所有: 江蘇利邦機電設備有限公司 Copyright ? 2018 蘇ICP備18027510號-1

主站蜘蛛池模板: av成人午夜无码一区二区| 国产精品无码久久久久久| 艳妇乳肉豪妇荡乳av无码福利| 亚洲精品乱码久久久久久不卡| 精品久久久噜噜噜久久久| 久久黄色网站| 精品人人妻人人澡人人爽牛牛| 国产精品久久久久久妇女| 亚洲av综合色区无码二区爱av| 99亚洲乱人伦aⅴ精品| 猫咪av成人永久网站在线观看| 亚洲av无码专区国产乱码4se| 亚洲日韩国产一区二区三区在线| 最新69国产成人精品视频免费| 日本免费一区二区三区高清视频| 免费国产裸体美女视频全黄| 黑人玩弄人妻中文在线| 熟女人妇交换俱乐部| 蜜臀aⅴ国产精品久久久国产老师| 亚洲欧美日韩在线一区| 无码国产精品一区二区免费vr| 朝鲜女人大白屁股ass孕交| 第一亚洲中文久久精品无码| 国产精品久久久久av| 久久久久久国产精品免费免费| 97夜夜澡人人双人人人喊 | 国产两女互慰高潮视频在线观看| 成人毛片18女人毛片免费| 亚洲国产精品日韩专区av| 亚洲中文字幕无码爆乳app | gogogo高清免费观看中国| 国产suv精品一区二区五| 真实国产精品vr专区| 1000部精品久久久久久久久| 同性男男黄g片免费网站| 成熟丰满熟妇高潮xxxxx视频| 超碰97资源站| 亚洲色偷偷av| 久久综合97丁香色香蕉| 欧美日韩精品久久久久 | 国产精品毛片va一区二区三区|